Clockwork Building – 2nd, 3rd & 4th Floor Office Refurbishment

Crestel Projects Ltd successfully delivered a high-quality CAT B refurbishment across the 2nd, 3rd, and 4th floors of the Clockwork Building, transforming vacant office accommodation into modern, market-ready workspace aligned with contemporary tenant expectations.

The project formed part of the landlord’s wider asset-enhancement strategy, focusing on improving presentation, functionality and lettability while working within a live, multi-tenanted building. Delivered under a tightly controlled programme, the refurbishment combined robust health & safety management with a refined architectural finish.

1. Project Overview

Working in close collaboration with the client team and the appointed surveyors, Crestel undertook a comprehensive internal refurbishment across three floors, creating bright, open-plan office environments with upgraded services, finishes and shared amenities. The completed spaces now provide flexible, high-quality accommodation suitable for immediate occupation.

The scheme balanced exposed structural elements with contemporary finishes, retaining the character of the existing concrete frame while delivering a clean, professional CAT B specification.

2. Scope of Works

3. Key Challenges and Solutions

01.
Live Building Environment

With other tenants remaining in occupation, careful planning was required to manage logistics, noise and access. Crestel implemented strict site segregation, coordinated deliveries with building management, and maintained clear communication with all stakeholders to minimise disruption.

02.
Existing Building Constraints

The 1970s concrete-framed structure required a sensitive approach to services coordination and finishes. Retaining exposed soffits while upgrading lighting and mechanical systems demanded close attention to detail to achieve both performance and aesthetics.

03.
Health and Safety Management

Working from detailed pre-construction information, Crestel developed and implemented a comprehensive Construction Phase Health & Safety Plan, ensuring full compliance with CDM 2015. All works were delivered with zero reportable incidents.

4. Sustainability and Compliance

5. Technical Project Data

6. The Result

The refurbished floors at the Clockwork Building now offer contemporary, flexible office accommodation finished to a high standard, enhancing the overall value and appeal of the asset. The project is a strong example of Crestel Projects’ ability to deliver complex commercial refurbishments within occupied buildings, combining programme certainty, quality delivery and rigorous compliance.