Book End, Witney – Full Commercial Refurbishment for Gnat
- Location - Witney
- Client - Gnat
Overview and Project Brief
Crestel Projects is thrilled to have commenced a comprehensive commercial refurbishment at the Book End site in Witney, commissioned by Gnat and delivered in collaboration with SGL Chartered Surveyors and Savills. This high-impact project embodies Crestel’s commitment to transforming commercial environments with precision, energy efficiency, and aesthetic excellence.
Project Highlights and Scope of Works
This refurbishment delivers a complete reinvention of the workspace, offering:
- Roof Overcoat and PV Panel Installation – Modernising the structure and embedding sustainable energy solutions.
- Cladding Replacement – Refreshing the building’s appearance from blue to a sleek, anthracite finish.
- LED Lighting Upgrades – Enhancing energy efficiency and visual comfort across the premises.
- New Air Conditioning Systems – Improving indoor climate control for the office areas.
- Upgraded Power and Mechanical Systems – Ensuring infrastructure resilience and future-proofing.
- Fitted New WCs and Showers – Boosting staff welfare and utility.
- Revamped Flooring Throughout – Delivering a fresh, cohesive flooring solution.
- New Kitchens Added – Elevating functionality and amenity levels.
These enhancements represent a full-spectrum refurbishment, from aesthetic upgrades to mechanical and energy systems.




Objectives and Strategic Benefits
The strategic goals of the intervention include:
01.
Energy Efficiency and Sustainability
PV panels and efficient LED systems align with modern environmental and operational cost goals.
02.
Modern Aesthetic and Brand Alignment
The anthracite cladding and upgraded interiors reinforce Gnat’s contemporary brand identity.
03.
Improved Workplace Comfort and Functionality
Enhanced lighting, air conditioning, new facilities, and kitchen areas support staff productivity and satisfaction.
04.
Future-Proofed Infrastructure
System upgrades ensure long-term reliability and adaptability for Gnat and future occupants.
Process and Methodology
Crestel Projects’ proven end-to-end approach ensures excellence at every stage:
- Planning and Coordination – Collaborating with surveyors and asset managers (SGL, Savills) to align project scope and specifications.
- Resource-Efficient Phasing – Organising workstreams (exterior, interior, systems, facilities) for minimal site disruption.
- High-Quality Execution – Applying superior craftsmanship in cladding, HVAC, flooring, lighting, and finishes.
- Energy Focus – Integrating PV and LED systems for sustainable value.
- Stakeholder Engagement – Maintaining transparency with Gnat, SGL, and Savills through regular progress updates.
- Quality Assurance and Compliance – Rigorous inspection, testing, and safety checks before handover.
Expected Outcomes and Impact
Upon completion, Book End will benefit from:
- Lower Operational Costs and Carbon Footprint
- Enhanced Brand Perception
- Increased Occupant Well-Being and Productivity
- Robust Infrastructure Supporting Future Adaptability
Visual Transformation Potential
Before-and-after visuals will showcase striking improvements:
- Exterior: New anthracite cladding with enhanced kerb appeal.
- Roof: Visible PV arrays emphasising sustainability.
- Interior: Bright, energy-efficient lighting, modern kitchens, fully refreshed flooring, and new bathroom/shower facilities.
Crestel Projects specialises in full commercial refurbishments, industrial transformations, and workplace upgrades across London and the UK. If you are a landlord, investor, or occupier looking to modernise your property, enhance sustainability, and create market-ready spaces, get in touch with our team today.