1. Project Context
Crestel Projects was appointed to deliver a refurbishment programme on a commercial building constructed prior to the year 2000 in Boston, Lincolnshire. As part of our standard pre-construction procedure, we commissioned a routine asbestos survey to ensure compliance with UK health and safety regulations before any physical works commenced.
This proactive approach not only safeguards our workforce and stakeholders but also ensures that every project we deliver adheres to legal obligations under the Control of Asbestos Regulations 2012.
2. Survey Findings
The independent asbestos survey identified the presence of Asbestos Insulating Board (AIB) within the first two bays of the existing internal roof lining panels. AIB is a high-risk asbestos material, historically used for insulation and fireproofing, and requires licensed removal under strict HSE guidelines.
3. Remediation Strategy
a. Engagement of Accredited Contractors
Crestel engaged one of our trusted, accredited, and licensed asbestos removal partners to carry out the works in full compliance with UK law and HSE protocols.
b. Mandatory 14-Day Notification
In line with statutory requirements, the Health and Safety Executive was notified, and a 14-day notification period was observed before removal commenced.
c. Safe Removal Process
The AIB was carefully removed by trained specialists, following controlled procedures including:
- Full containment and negative pressure environments
- Specialist PPE for operatives
- Strict waste handling and disposal routes
d. Air Testing and Certification
Post-removal, independent UKAS-accredited air testing was conducted to confirm the building was safe for reoccupation. A formal certificate of reoccupation was issued to the client, providing assurance of safety and compliance.
4. Next Phase: Roofing System Installation
With asbestos risks fully remediated and certification in place, Crestel Projects progressed to the original scope of works, the installation of a new composite roof sheet system. This modern roofing solution offers:
- Improved thermal efficiency
- Durability and weather resistance
- Reduced maintenance costs
- Compliance with modern building standards
5. Outcomes and Client Value
- Health and Safety Priority – Safe asbestos removal ensured compliance and safeguarded all stakeholders.
- Regulatory Compliance – Full adherence to HSE protocols and UK asbestos legislation.
- Client Assurance – Certification provided confidence and a clear audit trail.
- Future-Proofed Roofing Solution – Installation of a robust composite system enhances building performance.
6. Why This Matters
Asbestos remains one of the most significant risks in buildings constructed before 2000. Crestel Projects’ approach demonstrates how we combine safety, compliance, and technical excellence to deliver projects with confidence. From early-stage surveying through to certified remediation and high-quality construction delivery, we provide a seamless end-to-end service.
Crestel Projects specialises in safe asbestos remediation, compliant refurbishments, and roofing system upgrades across the UK. If you are a landlord, property manager, or asset owner needing to modernise pre-2000 buildings while ensuring full health and safety compliance, get in touch with our team today.