Supreme House, Finchley – Office and Common Parts Refurbishment

1. Project Overview

Crestel Projects is proud to reflect on the successful completion of a major office and common parts refurbishment at Supreme House in Finchley. This project marked a comprehensive transformation, delivering a modern, efficient, and vibrant workspace for our client while enhancing the building’s wider facilities and presentation.

The work was carried out with precision, attention to detail, and strong collaboration across all trades, ensuring the project was delivered on time, within budget, and to an exceptional standard.

2. Scope of Works

The refurbishment was a full-scale commercial transformation, covering both tenant and communal spaces.

Key deliverables included:

01.
Top-floor open-plan office refurbishment:

- Full M&E systems installation (mechanical, electrical, and integrated building services)

- New ceilings with improved lighting and acoustic performance

- Installation of partitions for functional zoning and privacy

- Raised access flooring for flexibility and modern IT integration

- High-quality floor coverings to complete a dynamic new office specification

02.
Communal areas and facilities upgrades:

- Bathroom refurbishments, delivering modern and efficient amenities

- Refreshed internal and external signage, improving wayfinding and brand presentation

- Full redecoration across shared areas and external façades, enhancing the building’s overall appearance and longevity

3. Objectives

This project was designed to achieve several key outcomes:

  1. Reimagine office space – Creating a modern, open, and flexible working environment.
  2. Upgrade building services – Installing efficient and reliable M&E systems.
  3. Improve tenant experience – Enhancing common areas and facilities to boost comfort and usability.
  4. Protect asset value – Delivering a future-proofed refurbishment that supports long-term occupancy and appeal.

4. Delivery Approach

Crestel Projects adopted a collaborative, phased approach to ensure efficient delivery without compromising quality:

5. Outcomes

The project was delivered successfully on time and within budget, achieving:

6. Team Recognition

We extend a huge thank you to our talented supply chain and subcontractors, whose precision, dedication, and craftsmanship made this transformation possible. From meticulous M&E work to flawless ceiling, partition, flooring, and signage installations, every detail contributed to a truly exceptional finish.

Crestel Projects specialises in commercial refurbishments, Cat A+ office fit-outs, and common parts upgrades across London and the South East. If you’re looking to transform your workplace or reposition your property for the future, our experienced team can help.