London Academy of Excellence Tottenham – Phase 1

Refurbishment and Reconfiguration Works

Lilywhite House, Tottenham Hotspur Stadium

Project Overview

Crestel Projects Ltd were appointed to deliver Phase 1 of a major internal refurbishment and reconfiguration of the London Academy of Excellence, located within Tottenham Hotspur Stadium at Lilywhite House.

The project involved the transformation of extensive areas across the second and third floors, creating modern, acoustically robust learning environments, specialist music facilities and upgraded staff accommodation. All works were undertaken within a live, mixed-use building, above a supermarket and below Tottenham Hotspur FC’s operational offices.

Crucially, the entire scheme was delivered within a summer holiday shutdown, with zero tolerance for overrun ahead of the new academic year.

Scope of Works

Phase 1 comprised a comprehensive refurbishment across multiple zones, including:

Key Challenges and Solutions

01.
Programme Certainty

All works were required to be completed within a fixed holiday window. Delays to specialist mechanical equipment created additional risk to the critical path.

Solution:
Crestel re-sequenced the programme to prioritise enclosure, acoustic construction and key teaching spaces, enabling parallel progress and maintaining the handover date.

02.
Acoustic Performance

Music and recording spaces were located adjacent to teaching areas and beneath third-party office accommodation.

Solution:
High-performance acoustic wall build-ups, box-in-box constructions, specialist doors and isolated ceilings were installed in line with BB93 guidance, achieving enhanced performance where required.

03.
Live Stadium Environment

Restricted access, event-day constraints and complex logistics formed part of the operational challenge.

Solution:
A tightly managed logistics strategy was implemented, with controlled access routes, just-in-time deliveries and continuous liaison with building management.

Phase 1 – Technical Project Data

Client:

London Academy of Excellence, Tottenham

Location:

Lilywhite House, Tottenham Hotspur Stadium, London

Contract Administrator/QS:

Taylor Associates (UK) Ltd

Architect:

Lyall Bills & Young Architects

Services Engineer:

Wilson Building Consultants

Acoustic Consultant:

Gillieron Scott Acoustic Design

Form of Contract:

JCT Intermediate Building Contract 2016 (with Contractor’s Design)

Programme Duration:

8 weeks (Summer holiday shutdown)

Contract Value (Final Account):

Cira £1.2 million

Phase 1 – Delivery KPIs

Outcome

Phase 1 delivered a high-quality, future-ready learning environment that supports both academic study and specialist teaching disciplines. The successful delivery under tight programme constraints positioned Crestel Projects as a trusted partner for subsequent phases.