Rate Mitigation Strip-Out and Tenant Preparation Works – Multi-Floor Commercial Building

1. Project Overview

Crestel Projects has successfully completed a rate mitigation strip-out project following the departure of tenants from a multi-floor commercial property.

This specialist scheme was designed to help the landlord reduce business rates liability while also preparing the building for future Cat A+ fit-out works. By carefully removing tenant-specific installations and leaving the communal cores intact, Crestel ensured the property was both compliant and optimised for the next phase of occupation.

2. Scope of Works

The project required a comprehensive tenant strip-out, which included:

01.

Removal of tenant-installed systems across three floor plates

02.

Full removal of internal ceilings

03.

Raised access floor removal

04.

Tenant-specific M&E removal, while preserving essential building systems

05.

Thorough testing of remaining M&E and fire alarm systems to ensure full compliance and operational safety

The result was a clean, compliant, and structurally sound environment, ready for landlord re-letting strategy and subsequent tenant fit-out.

3. Objectives

The project was driven by three clear goals:

  1. Rate Mitigation – Reducing the landlord’s liability by stripping out tenant installations no longer required.
  2. Compliance and Safety – Ensuring all retained M&E and fire systems were tested and certified safe for ongoing use.
  3. Future Readiness – Leaving the building in a condition that allows for efficient Cat A+ refurbishment and reoccupation by new tenants.

4. Challenges and Solutions

01.
Challenge 1: Careful Removal of Tenant Installations

Tenant-installed systems such as raised floors, ceilings, and bespoke M&E were closely integrated into the structure.

Solution:

Crestel deployed skilled strip-out specialists, using phased works to protect communal cores and base build elements.

02.
Challenge 2: Compliance with Safety Standards

Following the strip-out, the remaining systems required validation.

Solution:

Independent testing and certification of M&E and fire alarm systems provided assurance to both landlord and incoming tenants.

03.
Challenge 3: Maintaining Programme Efficiency

Tight timeframes meant all work had to be delivered quickly to support leasing strategies.

Solution:

Dedicated project management, scheduling precision, and a trusted supply chain ensured the programme was completed on time.

5. Results

6. Looking Ahead

With the rate mitigation project complete, Crestel Projects will soon return to the site to commence the Cat A+ refurbishment and tenant fit-out across all three floor plates. This next phase will include modernised finishes, new M&E systems, and full landlord-standard enhancements, creating move-in-ready commercial spaces for incoming occupiers.

Crestel Projects specialises in rate mitigation works, tenant strip-outs, and Cat A+ refurbishments across the UK. If you are a landlord, surveyor, or asset manager seeking to reduce liabilities and prepare your building for new occupiers, contact our team today to discuss your project.